Henham - Essex
One of our recent commissions. This summerhouse was designed to our Clients specific requirements. There were a lot of discussions throughout the design process to ensure that the build could progress quickly once agreed. This project is due completion in early September 2017.
As with all of the cabins constructed by Matt Brister D&B the construction methods used throughout the build are a mix of "old school" carpentry practises (such as diagonal bracing of the walls) and modern material mixes. This allows all of our cabins to perform to the latest regulations for heat loss, sound acoustic insulation and weatherproofing.